Chapter 17 a+ Guide to It Technical Support Reviewing the Basics

CONTACTS

  • Engineering Standards
    Tobin Oruch
  • Certificate Control
    Christina Salazar-Barnes

ENGINEERING STANDARDS MANUAL (ESM), STD-342-100

Quick Links:
Ch.ane-General Ch.eight-I&C Ch.15-Commissioning
Ch.2-Burn down Ch.9-Security Ch.16-IBC Program
Ch.3-Civil Ch.10-Hazardous Process Ch.17-Force per unit area Safety
Ch.iv-Architectural Ch.11-Radiation Protection Ch.18-Secure Communications
Ch.5-Structural Ch.12-Nuclear Ch.19-Communications
Ch.half dozen-Mechanical Ch.13-Welding, Joining & NDE Ch.20-Systems Engineering
Ch.seven-Electrical Ch.xiv-Sustainable Blueprint Ch. 21-Software

SEARCH the LANL Applied science Standards

ESM (Chapter 1 - General)

tackPOC: Tobin Oruch, ES-FE, 665-8475 tackAlternating POC: TBD tack Suggestions (LANL ONLY; use IE)
Section/Championship Rev. Date
Technical Requirements
Z10, General Requirements for All Disciplines/Chapters (READ Kickoff) 15 02/01/22
    Zipper A, Technical Baseline Drawings Guidance 5 08/25/10
    Attachment B, Technical Baseline Deliverables (New Facilities and Systems) iii 05/21/09
    Attachment C, Design Deliverable Schedule 30-60-90-100%
8 05/09/21
    Attachment D, Facility Design Descriptions (New Facilities) iii 05/21/09
    Attachment E, Life Bicycle Cost Methodology Guidance
Note: Also see Life-Bike Price Analysis (LCCA) Calculator and Resource
3 05/21/09
    Attachment F, Specifications
LANL-produced specs also follow AP-341-610 (LANL just)
ii 04/05/18
          FM01: Approval/Cover Sail for Externally Produced Specifications 2 04/05/18
          FM02: Table of Contents Sample 2 04/05/18
          Appendix A. Considerations in Developing Engineering science Specifications (Guidance)
          Appendix B. Engineering Specifications Checklist (Guidance)
          Appendix C. Equipment Data Canvas Examples
          Appendix D: Procurement-Only, Non-CSI Spec Format Template
          Appendix Eastward: Wording of Specs
Z10 References
2137 - Conduct of Engineering Asking for Variance or Culling Method (LANL only)
2176 - Conduct of Engineering Formal Clarification or Interpretation Request (.pdf) - 10/2010
2178 - Subcontractor Deviation Disposition Request - nine/2021
Ch. 1 Z10 Requirement Bases (east.yard., ane-0XXX; xls, LANL only)
ARMAG robust structure summary of LANL requirements and guidance (LANL only, xls), R0, 10/4/2021
200, Item Numbering and Labelling 9 12/21/21
     Attachment 1: CMMS Upload Workbook (xls) (Note: If printing, some tabs are 11x17, others 8.5x11) 1.2 01/31/22
     Attachment 2: CMMS Parameters (Guidance) (xls)  0.2 12/21/21
     Course 01: CMMS Change Approval Grade (Instructions) i 12/21/21
   Reference: MEL Change Approval FDAR Delegations (pdf) 02/22/22
210, Organization List [decision-making procedure just] 6 01/28/21
    Zipper 1: Use Section 200 Att i CMMS Upload Workbook'due south Section 210 tab  - 01/31/22
220, System Boundaries 1 10/27/06
230, Types and Subtypes for Equipment Items [controlling procedure only] nine 01/28/21
Zipper ane: Employ Section 200 Att 1 CMMS Upload Workbook'south Section 230 tab - 01/31/22
Administrative Requirements
Section 100, Standards Administration by Standards Team 7 09/eighteen/13
      Appendix A: Approval/Signature Canvas 9 07/25/17
      Appendix B: ESM Personnel Qualification Tape seven 09/18/xiii
      Appendix C: ESM Change Proposal vii 09/18/13
      Appendix D: ESB Coming together Omnipresence and Voting Record 7 09/18/xiii

Top of page

ESM (Affiliate 2 - Fire Protection)


tackPOC: Keenan Dotson, ES-FP, 667-5219 :tack Alternate POC: Shaun Wrightson, ES-FP, 665-7350 tack Suggestions (LANL ONLY; use IE)
tack Specs/Details POC:  Todd Smith, ES-EPD, 665-3152 (Schedule B) / Alternating:  Scott McMurtrey
Section/Championship Rev. Date
D40, Fire Protection 6 02/05/21
   Att. one, Adopted Editions of NFPA Burn down Protection Codes, Standards, and Recommended Practices 0 02/05/21
Chapter References
Engineer and the Engineering Technician Designing Burn down Protection Systems (articulation position on from SFPE/NSPE/NICET) -- LANL'due south preferred segmentation of responsibleness
Construction Inspection Div of Responsibilities for Burn down Protection 4 09/xxx/twenty
NFPA code/std access:  LANL users: use IHS; others:  Register for viewer. Annotation:  NFPA only publishes read-only products.
IFC-2015:   Equally of 1/27/2021, 4th Printing is latest.  PDF users, download from IHS.  Older hardcopy users, Errata are here (from ICC errata site hither).
ESM Ch. ii Requirement Bases (e.g., ii-0XXX; xls, LANL simply)

Top of page

ESM (Chapter 3 - Civil)


tackPOC: John O'Brien, ES-UI, 606-0335 tack Listing of Complete Alternates tack Suggestions (LANL But; use IE)
Section/Championship Rev. Appointment
G10-30GEN, Full general Civil Requirements (READ Commencement)
VAR-10468 - Revised Storm Water Textile (Att found in left nav of pdf)
3 05/27/fifteen
G10, Site Preparations
VAR-10468 - Revised Storm Water Textile (Att plant in left nav of pdf)
iii 05/27/fifteen
G20, Site Improvements
VAR-10468 - Revised Storm Water Fabric (Att found in left nav of pdf)
3 05/27/fifteen
G30, Site Civil / Mechanical Utilities
    VAR-10251- Elevator Station Placement
three 05/27/15
Chapter References
Depression Bear upon Development Standards for Stormwater (G20)

Elevation of page

ESM (Chapter four - Architectural)


tackPOC: Scott Richardson, ES-EPD, 606-0596 tack Alt:TBD tack Suggestions (LANL But; employ IE)
Section/Title Rev. Date
B-C GEN, General Architectural Requirements (READ FIRST)
iv 02/07/xix
B Shell, Building Shell
4 02/07/19
C Interior, Building Interiors four 02/07/19
    VAR-10526, Gender-Neutral Restroom Addendum to ESM and TSM
Affiliate References
Sustainable Design Guide
Site & Architectural Design Principles
LANL'due south Site & Architectural Design Principles (posted with ESM Ch 4, Ch 14 and the Design Guides webpage) were created in 2001-02. Although some references to organizations and standards are outdated, the design principles and concepts in this document are nevertheless applicable and should be followed.
  • Forward
  • Table of Contents
  • Introduction
  • Implementation
  • Design Procedure
  • Introduction-Guidelines for Site Design Section
  • Section A-Land Use and Sitings
  • Section B-Circulation
  • Section C-Landscape Elements
  • Guidelines for Architectural Design
  • Appendix

Acme of page

ESM (Chapter 5 - Structural)


tackPOC:Mike Salmon, ALDFO, 665-7244 tack Alt. POC: Michael Denlinger, ES-EPD, 667-6572 tack Suggestions (LANL Just; apply IE)
tack Specifications/Details POC: Michael Denlinger, ES-EPD, 667-6572
Section/Title Rev. Date
I, Full general Criteria (READ FIRST)
8 03/24/21
II, Commercial Design and Analysis Requirements 11 03/24/21
Reference: IBC SDC C versus D – Effect on LANL Design (pdf) 1 05/19/21
   Reference: SDC-C "All Other Systems" Usage Prebid Approval Asking Form (md) 0 12/21/21
   Reference: Risk Category for Explosive Facilities at LANL (pdf) - 7/22/21
III, Nuclear SSCs Blueprint and Analysis Requirements
ten 07/19/21
   Reference:  Hilti KB-TZ and KB-TZ2 Anchor Supply/Option Guidance (TA-55 only) 08/09/21
4, Geotechnical Investigations half-dozen 03/27/xv
Affiliate References
Requirements ID Log (xls) (e.g., 5-0XXX; LANL only)
NOTE:  Building PC true cat historical data is in ARCHIBUS.  Access with cryptocard; select Infinite Inventory & Performance, then LANL Special Reports, and then Ascertain Seismic Information (newer RC or NDC/LS information may also be there).  The contacts for updates are Kenny Feller and Scott RichardsonEquipment/Component PC and RC/NDC information is in CMMS (use IE).

Top of page

ESM (Chapter 6 - Mechanical)


tackPOC: Michael Ladach, ES-EPD, 667-6229 tack Alternate POC: Todd Smith, ES-EPD, 665-3152 tack Suggestions (LANL Merely; utilize IE)
Section/Title Rev. Date
D10-30GEN, General Mechanical Requirements (READ Commencement)
     VAR-10053, Exception to Equipment Housekeeping Pad Requirement
5 09/29/14
D10+E10, Equipment 4 09/29/fourteen
D20, Plumbing/Piping/Vessels 6 02/26/15
D30, HVAC, Heating, Cooling, HVAC Distribution and TAB
VAR-10298, ASME AG-one and DOE-HDBK-1169 Applicability to Not-Credited Ventilation Systems
5 09/29/14
Chapter References
UMC and UPC (read but) from IAPMO website (LANL can use IHS)

Top of page

ESM (Chapter seven - Electric)


tackPOC: Eric Stromberg, ES-EPD, 665-6070 tackAlternate POC: Michael Richardson, ES-EPD, 667-0599 tack Suggestions (LANL Simply; apply IE)
Department/Title Rev. Engagement
D5000, Full general Electric Requirements (READ Starting time) 8 07/24/19
D5010, Electrical Service & Distribution
     Reference: Transformer Pattern Guidance, R0 9/14/21
v
02/eleven/19
D5020, Lighting & Co-operative Circuit Wiring
VAR-2014-046, Non-Powered Exit Signs
VAR-10183, Allowance for multi-wire co-operative circuits
VAR-10139, Dedicated Equipment-grounding Conductors and Raceways (affects D5020)
5 xi/08/11
D5030, Communications (Superseded past Ch.19-D60)
D5090, Other Electrical Systems 5 12/nineteen/xiii
G4010, Site Electrical Distribution 4 01/15/19
G4020, Site Lighting 3 05/12/10
G4030, Site Communication (Superseded by Ch.nineteen-G50)
G4090, Other Site Electrical Utilities 2 ten/27/06
Chapter References
Electrical Inspection Plan Guidance 0 02/25/twenty

Tiptop of page

ESM (Chapter 8 - Instrumentation & Controls)


tackPOC:Allen Hayward, ES-EPD, 606-0840 tack Alternate POC:TBD tack Suggestions (LANL ONLY; utilise IE)
Section/Title Rev. Date
Department D3060.90- Instrumentation & Command (READ FIRST) iv 09/29/xiv
     Attachment A: Instrumented Systems used in Safe Pregnant & Hazardous Processes Blueprint Guidance two 09/29/14
     Zipper B: Fail Safe Blueprint of Procedure Control Loops Guidance 2 09/29/xiv
     Zipper C: I&C Design Review Guidance 2 09/29/14
     Zipper D: Installation & Calibration of Instruments Guidance ii 09/29/fourteen
     Attachment E: Alarm Direction Guidance 2 09/29/14
     Zipper F: Instrument Loop Diagrams Guidance ii 09/29/14
     Zipper G: Control Logic Diagrams Guidance 2 09/29/14
     Attachment H: Console and Wiring Diagram Guidance 2 09/29/14
     Attachment I: PFD and P&ID Diagram Requirements ane 09/29/xiv

Peak of page

ESM (Chapter ix - Security)


tackPOC: Jeff Mccale, SEC-PSS, 667-9764 tack Alternate POC: Deborah Miller, SEC-PSS, 606-2067 tack Suggestions (LANL Just; use IE)
Section/Title Rev. Date
Facility Protection and Security [email for access] 4 01/08/18
VAR-10381, Vault Door and X-ray Automobile Purchase Approvals

Top of page

ESM (Affiliate 10 - Hazardous Procedure)


tackPOC:Devin Grayness, ES-55, 667-3584 tack Alternate POC: Tobin Oruch, ES-Fe, 665-8475 tack Suggestions (LANL But; employ IE)
Section/Title Rev. Date
F1030.threescore, Chancy Process 2 09/29/14
  Attachment A: Hazardous Gas Design 2 09/29/14

Top of folio

ESM (Chapter 11 - Radiation Protection)


tackPOC:  Keith Luna, RP-PROG, 667-1142 tackAlternating POC: Jordan Douglas, RP-PROG, 665-2445 tack Suggestions (LANL Merely; use IE)
Department/Title Rev. Engagement
F1030.50, Radiation Protection ii 01/08/18
   Attachment A: Radiation Protection Design Considerations &   Features (Guidance)
VAR-10347 - Radiological Engineering science Design/Blueprint Support
2 01/08/eighteen

Acme of page

ESM (Affiliate 12 - Nuclear)


tackPOC: Tobin Oruch, ES-Iron, 665-8475 tackAlternate POC: TBD tack Suggestions (LANL Merely; apply IE)
Section/Championship Rev. Engagement
F1030.70, Nuclear 3 09/29/14

Top of folio

ESM (Chapter 13 - Welding, Joining & NDE)


tackPOC: David Bingham, ES-EPD, 664-0416 tackAlternate POC: Richard Bingham, PF-TDI, 667-7077 tack Suggestions (LANL ONLY; employ IE)
Section/Championship Quick Links
Table of Contents - 1-99, Glossary
-Exemptions
Volume 1 - Full general Welding Standards (GWS) -Filler Textile Locations/Issuers
Volume two - Welding Fabrication Procedures (WFP) -Filler Metal Documents
Book three - Welding Procedure Specifications (WPS) -Inspectors
Volume 4 - Welding Technique Sheets (WTS) -LANL WPS Index
Volume 5 - Procedure Qualification Records (PQR) -Warehouse Stocked Filler Fabric
Volume six - Welding Inspection & Full general NDE -Welding Checklist
-Welder Qualification Database

Tiptop of page

ESM (Chapter 14 - Sustainable Design)


tackPOC: Tobin Oruch, ES-Iron, 665-8475 tack Alternate POC: Michael Ladach, ES-EPD, 667-6229 tack Suggestions (LANL Simply; use IE)
Section/Title Rev. Engagement
Sustainable Design of Facilities x 07/31/2019
   Attachment i- Environmentally Preferable Products for Design Agency Created Specifications 02/03/2022
Chapter References:
Chapter 14 References

Height of page

ESM (Chapter xv - Commissioning)


tackPOC: Cindy Dilworth, CM-STUPCOMM, 665-6304 tackAlternating POC: Charles Richardson, CM-STUPCOMM; 667-3374 tack Suggestions (LANL Just; use IE)
Section/Title Rev. Date
Commissioning one 03/22/19
Attachment A: Commissioning Process Catamenia Chart 1 03/22/nineteen
Affiliate References:
DOE G 413.three-23, Nuclear Facilities Commissioning [directives.doe.gov]

Top of page

ESM (Affiliate 16 - IBC Program)


tackPOC: Tobin Oruch, ES-Iron, 665-8475 tack Alternating POC: Scott Richardson, ES-EPD, 606-0596 tack Suggestions (LANL Just; use IE)
Section/Title Rev. Date
IBC-GEN - IBC General Requirements (READ Kickoff)
11 11/29/18
   Att. A: LANL Edifice Code (LBC) 12 02/05/21
   Att. B: LANL Existing Building/System Code (LEBC) nine 03/24/21
   Class 1: Preliminary Project Determinations (Instructions) 5 02/17/21
   Course 2: HazMat Decision 1 05/22/14
   Form 3: Registered Design Professional in Responsible Charge Designation (Sample) 1 09/24/xiii
   Form 4: LBO Observe of Violation 0 09/24/13
   Form five: Building/System Final Inspection Checklist and Certificate of Occupancy 8 03/30/15
Reference: Fire Alarm Work Alteration Levels (ES-Practise-Memo-22-003)
Reference: Certificate of Occupancy Checklist Template (12-vii-2020)
-
-
IBC-IP - IBC Inspection Process
     VAR-10168, ESM Chapter 16-IBC Program Inspection Scope
9 ten/06/16
   Attachment A: Special Inspection and Testing Summary (Sample) i 09/24/thirteen
   Attachment B: Statement of Special Inspections 14 05/eighteen/21
   Zipper C: Nonconformance Study Instance i 09/24/13
Attachment D: IBC Inspection Daily Report (Sample)
Reference:
WI-400-282-FM01: IBC/Owner's Inspection Written report
ane 09/24/13
   Zipper E: IBC Inspection Concluding Written report (Sample)
Reference: WI-400-282-FM02, Final Report of Special  Inspections by LANL
2 09/24/13
   Attachment F: Job Task Listing for Inspectors (Guidance) 1 09/24/13
   Attachment G: Structural Ascertainment Class (Sample) 3 03/27/15
   Attachment H: Subcontractor's Argument of Responsibility ii 03/27/xv
   Zipper I:  Exam and Inspection Program Template 0 09/24/13
Reference: Fire Protection Div of Responsibilities for Construction Inspection 4 09/30/20
Reference: Electrical Inspection Plan Guidance 0 02/25/xx
Reference: Independence Requirements for Tertiary Party Inspection Agencies (LANL merely)  NEW Dec 2021 -
IBC-TIA - IBC Test and Inspection Bureau Approval Process 3 09/xv/09
   Zipper A: IAS Special Inspection and Testing Bureau Approval Information 1 07/21/08
   Attachment B: Inspector Qualification Guidelines 5 10/10/12
IBC-FAB - Offsite Structural Fabricator Approval Procedure 6 06/20/xi
   Attachment A: Offsite Structural Fabricator Application for LBO Blessing 1 07/21/08
   Attachment B: Offsite Structural Fabricator Certificate of Compliance 0 07/21/08
Chapter References:
Listing of LBO-Approved IBC Testing, NDE, and Inspection Agencies; Fabricators; and Products 07/28/21
Arrangement Chart xi/09/21
IBC or IEBC Review Subject Matter Adept Listing (LANL only)
NEW!! IBC Permitting Process (LANL only) 04/fifteen/15
LBO Permit Database (LANL WIN account required, enter password if prompted)  NEW!
IBC-2015:  Equally of i/27/2021, Third Printing is latest.  PDF users, download from IHS.  Older hardcopy users, Errata are here (from ICC errata site here).
IEBC-2015:  Equally of 1/27/2021, Fifth Press is latest.  PDF users, download from IHS.  Older hardcopy users, Errata are here (from ICC errata site here).
Historical UBC 1927-1964 and 1967-1994; Contact POC for 1997 UBC and IBC 2000 onward
Free I-code views (search IBC, IEBC, IFC, IECC, etc.; LANL can use IHS)
ARMAG robust structure summary of LANL requirements and guidance (LANL only, xls), R0, 10/iv/2021

Top of page

ESM (Affiliate 17 - Pressure Safety)


tackPOC: Ari Ben Swartz, ES-EPD, 606-2279 tack Alternate POC: Tobin Oruch, ES-Fe, 665-8475 tack Suggestions (LANL Only; utilize IE)
Section/Championship Rev. Engagement
GEN - GENERAL Requirements (READ FIRST)
0.1 12/16/21
     Attachment GEN-1, Definitions and Acronyms 1 03/15/16
          VAR-10281-R3, Certification of Force per unit area Systems (see ADMIN-1 below)
     Zipper GEN-2, Exclusions from Program 0.ane 08/21/17
     Zipper GEN-3, OSHA Requirements for Force per unit area Systems 0 09/17/xiv
ASME - New ASME System Requirements
1 12/eleven/18
     Zipper ASME-1, Code and Regulation Awarding 0 09/17/xiv
     Attachment ASME-2, National Board Inspection code NB-23 0 11/09/xviii
     Attachment ASME-3, Category M Fluids 0 09/17/14
     Attachment ASME-4, Acceptable Items for Code Construction 0 09/17/14
     Zipper ASME-4-i, Designer-Canonical Alternative Hose Restraints 0 09/17/fourteen
     Attachment ASME-4-2, Swagelok Flex Hoses 0 09/17/xiv
     Attachment ASME-five, B&PVC Awarding 0 11/09/eighteen
Unlisted Components Approval Process and Forms
NASME - New Non-ASME Organisation Requirements 0 09/17/14
NASME-one, B31.3 Equivalent Safety Evaluations:
NASME-1-A, Category D Non-Metallic Requirements for Piping Not Associated with Pressure Vessel, Boilers, or Air Receivers 1 06/xxx/xv
NASME-one-B, Category Normal Not-Metallic Requirements for Piping Not Associated with Pressure Vessel, Boilers, or Air Receivers 1 06/30/15
NASME-1-C, Normal Fluid Service Requirements for Metallic Piping Not Associated with Pressure Vessel, Boilers, or Air Receivers 2 08/24/15
NASME-i-D, Category D Requirements for Metallic Pipe not Associated with Pressure Vessel, Boilers, or Air Receivers 2 11/09/18
NASME-ii, B31.ix Equivalent Condom Evaluation 0 03/03/16
Reference: When listed components cannot be used, reputable manufacturers equally discussed in NASME-i-a, b, etc. (xls) (LANL only) 02/07/2022
EXIST - Legacy System Requirements 2 05/25/17
     VAR-10163, In Process Examination of Tie-in to Existing Contaminated Pipage
     VAR-10198, In-process Test of Tie-in to Existing Contaminated Wet Vac Pipe
     Exist-i, Gamble-Based Technology Evaluation of Existing (Legacy, etc.) Pressure Systems 0 09/17/14
     EXIST-1a, Qualitative Hazard for Inert Gas Cylinders Existing Systems Only 0 09/17/14
     EXIST-1b, Qualitative Risk for Low Force per unit area Steam and Steam Condensate 0 09/17/14
     Exist-1c, Qualitative Chance Evaluation for Compressed Air Systems Existing Systems Only 0 09/17/14
ADMIN- Administrative Requirements 0 09/17/14
ADMIN-1 , LANL Review Processes 1 03/xv/16
     VAR-10281-R3, Certification of Pressure Systems
Att A: R&D Force per unit area System Certification Process (with forms FM-R&D-REVIEW
and FM-R&D-DOCS)
Att B: Facility and Non-R&D Pressure Arrangement Certification Process (with required       documentation by ASME B31 codes) (B31.ane), (B31.3), (B31.5), (B31.viii), (B31.9)
Reference: PSIP/Pressure Safety Implementation Plan - TLW Example (LANL only/by request)
     ADMIN-1-1, Pressure Rubber Forms FM01-FM10 (pdf) 2 03/fifteen/16
Reference:  PSCS database xls-like templates for documentation vice Word forms
     ADMIN-ane-2, Course Directions (FM01-FM10) 0 09/17/fourteen
     ADMIN-ane-3, Existing (including Legacy) System Documentation Requirements
VAR-10317, Certification of Legacy Pressure Prophylactic Systems
VAR-Attachment: Modified Zipper ADMIN-1-three (Tables 1-three-N through U)
0.i 05/04/sixteen
     ADMIN-i-four, New Organisation Document Requirements 0 09/17/14
          Reference:  Pressure Exam Data Sail Example (WI-400-260-FM04, R4)
     ADMIN-1-five, Pressure level System Owner Checklist for New or Modified Systems (Guidance) 0 09/17/14
     ADMIN-1-6, Risk-Based Certification Processing and Maintenance (Guidance) 0 09/17/14
ADMIN-ii , Design, Documentation, and Records
Note: The variances listed below use to ADMIN-ii, 1.0 Design and Documentation,
Subsection N. Material Compatibility (pg. 12)
VAR-2016-006, ASME B31.3-2014 as the lawmaking of record for hydrogen, deuterium, or tritium services
   Subsection R. Piping Flanged Joint Connection Assembly (pg.eighteen)
VAR-10119 Rev. 1, Possessor Acceptance of ASME B16.5 Flange Design (e.g., Commodities Stress)
   Subsection S. Piping Supports and Flexibility Analysis (pg.18)
VAR-10128, Acceptance of Engineered Piping Supports
Subsection T. Force per unit area Relief Requirements (pg.19)

VAR-2015-045, Alternate Method for Relief Devices
ESM-CIR-2015-005, ASME Code Stamped
   Subsection X. Vacuum and Externally Pressurized Components and Pipe (pg.25)
VAR-2015-032, Conflat Flanged Fittings (attachments take been removed from this file)
0 09/17/fourteen
Unlisted Components Approving Procedure and Forms
     ADMIN-ii-1, Relief Device Selection Process for Gas Bottle Systems (Guidance) 0 09/17/14
ADMIN-three , Procurement, Fabrication, and Assembly
NOTE: The variances listed beneath employ to ADMIN-3, Procurement, Fabrication, and Assembly
Subsection O. Flanged Joint Assemblies (pg.7)
VAR-10119 Rev. 1, Owner Credence of ASME B16.5 Flange Pattern (due east.grand., Bolt Stress)
0 09/17/14
     ADMIN-three-FM01, Regulator and Relief Device Procurement Pre-approval 3 03/31/21
     ADMIN-3-FM02, ASME Vessel Pre-approval ane 03/31/21
     ADMIN-3-FM03, Steam and Banality Regulator and Relief Device Procurement Pre-blessing 2 03/31/21
Reference: Approver Listing for Pressure level System Component Buy
ADMIN-four , Inspection and Testing 1 11/18/15
   VAR-10429, Relief Device Settings for Pneumatic Testing 0 02/11/21
   VAR-10478, Mitsubishi City Multi VRF PURY-P TLMU-A and YLMU-A R410A Force per unit area Testing 0 08/03/21
Reference:  Pressure Test Data Sheet Example (WI-400-260-FM04, R4)
Reference: ASME-B31.5 Refrigeration Pipe Test Plan Template
Reference:  ASME-B31.5 Specific Leak Testing Information Sheet
     ADMIN-iv-1, Pressure level Vessel Inspection and Test Procedure 0.i 02/29/16
     ADMIN-4-2, Hose Assembly Inspection (Guidance) 0 09/17/xiv
     ADMIN-4-iii, Pressure Regulator Maintenance (Guidance) 0 09/17/14
REF - Reference
REF-i, 10CFR851 on Pressure Safe (See 10CFR851 link under Chapter References below) 0 09/17/14
REF-2, ASME Codes; Standards; Regulations; and other References [list and links only] 0 09/17/fourteen
REF-3, ASME B31.3 Process Pipe Guide - [temporarily withdrawn]
     VAR-2015-011, Copper Tubing Alternative
Quality Control Systems Manual (R-Stamp Programme, LANL simply)
VAR-10170, Continued Operation of NBIC Owner User Inspection Program
0 9/7/xvi
QCSM-ISQP-Inspector and Supervisor Quality Programme (LANL only) 0 12/11/18
Chapter References:
Pressure Protection webpage (CAP, PS Committee, etc.) (LANL only)
Pressure Arrangement Certification System
10CFR851 Worker Safety and Health Programme with Technical Amendment, key info in Subpart C and App A 12/18/17
DOE Worker Safe and Health Policy Clarification Portal (PC Portal)
Affiliate 17, Boosted Pressure Rubber Reference Data including Swagelok assembly (LANL merely-click for alive links)
Chapter 17, Pressure Safety entire affiliate (mostly including attachments and amendments [labwide variances and clarifications every bit attachments]).
Meant to assistance browsing or searching for topics, only not performing work by it.
last updated
1/09/twenty

Pinnacle of page

ESM (Chapter xviii - Secure Communications)


tackPOC: Adrian Trujillo, NIE-ESS, 667-2581 tack Alternating POC: Sean Beggio, NIE-TS, 665-8191 tack Suggestions (LANL Simply; use IE)
Section/Title Rev. Date
Secure Communications 1 02/12/fifteen

Top of page

ESM (Chapter 19 - Communications)


tackPOC: Pete Lowe, NIE-TS, 665-9147 tack Alternate POC: TBD tack Suggestions (LANL Only; use IE)
Section/Title Rev. Date
D60, Communications one 09/01/20
G50, Site Communications
     VAR-2016-024, Length of pathway
0 02/23/fifteen

Pinnacle of page


ESM (Affiliate 20 - Systems Engineering)


tackPOC: Tobin Oruch, ES-Atomic number 26, 665-8475 tack Alternating POC: TBD tack Suggestions (LANL ONLY; employ IE)
Department/Championship Rev. Appointment
SE Requirements 0 09/20/17
SE Guide 0 09/20/17
References:
SE SEP Estimate Example (xls)
Blueprint Verification Matrix Template Sample


ESM (Chapter 21 - Software)


tackPOC: Tobin Oruch, ES-Fe, 665-8475 tack Alt POC: Allen Hayward, ES-EPD, 606-0840 tack Suggestions (LANL Only; use IE)
tack ES-Div Software Coordinator:  Carrie Atencio, ES-Practice, 665-7455
Section/Title Rev. Date
SOFT-GEN: General Software Requirements (READ First)
(file also includes appendices)
1 05/25/17
  Appendix A:  Chapter 21 Definitions, Responsibilities, and Acronyms 1 05/25/17
  Appendix B:  Chapter 21 SO and SRLM Decision Diagram (Guidance) i 05/25/17
  Appendix C:  Chapter 21 Reference List 1 05/25/17
  Attachment 1: Chapter 21 Summary Table i 05/25/17
  SOFT-GEN-FM01: Software Datasheet Form (SWDS)
SOFT-GEN-FM01(I): Instructions with Example
1
one.1
05/25/17
09/01/17
  SOFT-GEN-FM02: Software Baseline Grade (SWBL)
SOFT-GEN-FM02(I): Instructions with Case
1 05/25/17
  SOFT-GEN-FM03: Non-SSC Software Change Bundle Class (SWNCP)
SOFT-GEN-FM03(I): SWNCP Instructions with Case
one
i.1
05/25/17
03/27/18
  SOFT-GEN-FM04: SSC Software Change Package Course (SWCP)
SOFT-GEN-FM04(I): SWCP Course Instructions
VAR-10365-R1, Ch 21 SSC Software Alter Packet Form superseding AP-341-507
i 09/28/20
References:
  GEN Subsection two.0 Example Software Summary
  Form 2033, Safe/Non-Safety Software Decision, Categorization, and Software Risk Level (SRL)
VAR-10326-R1, Chapter 21 (Software) activity and form approvals for Safety Footing and Nuclear Criticality Safety Divisions
Template 3046, Software Risk Register (contact POC for examples)(.dotx)
SOFT-Larn: Acquisition one 05/25/17
Reference: ANSYS Fluent CGD/5&V Package Instance (request from Chapter POC)
SOFT-Design: Design i 05/25/17
References:
  Software Requirements Specification (SWRS) Example (Source Tracker)
   Blueprint Document (SWDD) Example Template
  Pattern Certificate Case for Designed Software (Source Tracker)
  User Manual (O&M instructions) for Designed Software (Source Tracker)
SOFT-V&V: Verification & Validation one 05/25/17
  Appendix A: Software Test Program Requirements Table
  SOFT-Five&V-FM01: Software Approval for Use Grade (SWAU)
SOFT-V&V-FM01(I): Instructions With Example
i
05/25/17
References: 5&V Templates and Examples
  Form 3056 - Software Requirements Traceability Matrix (SWTM) (.dotx) Helps implement SW requirements ID and traceability requirements
  Example Requirements Traceability Matrix (Source Tracker)
  Software Test Plan (SWTP) Template
Software Exam Instance (SWTC) Template
  Case No. 1 Test Plan (Source Tracker)
  Example No. 1 Test Program/Report (Source Tracker)
  Instance No. 2 Test Study
  Example No. 3 Exam Study
  Instance SWAU Request Package Checklist (MACCS2)
SOFT-INV: Inventory i 05/25/17
SOFT-MAINT: Apply, Maintain & Retire 1 05/25/17
Chapter References:
Document Numbering SharePoint (LANL only)
ES Division Not-SSC Software Inventory (LANL simply)
ESDO-AP-002, Engineering Services (ES) Software Inventory Instructions (LANL only) Rev. 0, 06/05/17
Safety Software Inventory  (LANL simply)
Chapter 21, Software unabridged affiliate (generally including attachments and amendments [does not include labwide variances and clarifications]).
Meant to help browsing or searching for topics, but not performing piece of work past it.
last updated
01/09/20

Height of page

perezsprome.blogspot.com

Source: http://engstandards.lanl.gov/ESM_Chapters.shtml