Chapter 17 a+ Guide to It Technical Support Reviewing the Basics
CONTACTS
| ENGINEERING STANDARDS MANUAL (ESM), STD-342-100
ESM (Chapter 1 - General)POC: Tobin Oruch, ES-FE, 665-8475 Alternating POC: TBD Suggestions (LANL ONLY; use IE)
Top of page ESM (Affiliate 2 - Fire Protection) POC: Keenan Dotson, ES-FP, 667-5219 : Alternate POC: Shaun Wrightson, ES-FP, 665-7350 Suggestions (LANL ONLY; use IE) |
Section/Championship | Rev. | Date |
---|---|---|
D40, Fire Protection | 6 | 02/05/21 |
Att. one, Adopted Editions of NFPA Burn down Protection Codes, Standards, and Recommended Practices | 0 | 02/05/21 |
Chapter References | ||
Engineer and the Engineering Technician Designing Burn down Protection Systems (articulation position on from SFPE/NSPE/NICET) -- LANL'due south preferred segmentation of responsibleness | ||
Construction Inspection Div of Responsibilities for Burn down Protection | 4 | 09/xxx/twenty |
NFPA code/std access: LANL users: use IHS; others: Register for viewer. Annotation: NFPA only publishes read-only products. | ||
IFC-2015: Equally of 1/27/2021, 4th Printing is latest. PDF users, download from IHS. Older hardcopy users, Errata are here (from ICC errata site hither). | ||
ESM Ch. ii Requirement Bases (e.g., ii-0XXX; xls, LANL simply) |
Top of page
ESM (Chapter 3 - Civil)
POC: John O'Brien, ES-UI, 606-0335 Listing of Complete Alternates Suggestions (LANL But; use IE)
Section/Championship | Rev. | Appointment |
---|---|---|
G10-30GEN, Full general Civil Requirements (READ Commencement) VAR-10468 - Revised Storm Water Textile (Att found in left nav of pdf) | 3 | 05/27/fifteen |
G10, Site Preparations VAR-10468 - Revised Storm Water Textile (Att plant in left nav of pdf) | iii | 05/27/fifteen |
G20, Site Improvements VAR-10468 - Revised Storm Water Fabric (Att found in left nav of pdf) | 3 | 05/27/fifteen |
G30, Site Civil / Mechanical Utilities VAR-10251- Elevator Station Placement | three | 05/27/15 |
Chapter References | ||
Depression Bear upon Development Standards for Stormwater (G20) |
Elevation of page
ESM (Chapter four - Architectural)
POC: Scott Richardson, ES-EPD, 606-0596 Alt:TBD Suggestions (LANL But; employ IE)
Section/Title | Rev. | Date |
---|---|---|
B-C GEN, General Architectural Requirements (READ FIRST) | iv | 02/07/xix |
B Shell, Building Shell | 4 | 02/07/19 |
C Interior, Building Interiors | four | 02/07/19 |
VAR-10526, Gender-Neutral Restroom Addendum to ESM and TSM | ||
Affiliate References | ||
Sustainable Design Guide | ||
Site & Architectural Design Principles LANL'due south Site & Architectural Design Principles (posted with ESM Ch 4, Ch 14 and the Design Guides webpage) were created in 2001-02. Although some references to organizations and standards are outdated, the design principles and concepts in this document are nevertheless applicable and should be followed.
|
Acme of page
ESM (Chapter 5 - Structural)
POC:Mike Salmon, ALDFO, 665-7244 Alt. POC: Michael Denlinger, ES-EPD, 667-6572 Suggestions (LANL Just; apply IE)
Specifications/Details POC: Michael Denlinger, ES-EPD, 667-6572
Section/Title | Rev. | Date |
---|---|---|
I, Full general Criteria (READ FIRST) | 8 | 03/24/21 |
II, Commercial Design and Analysis Requirements | 11 | 03/24/21 |
Reference: IBC SDC C versus D – Effect on LANL Design (pdf) | 1 | 05/19/21 |
Reference: SDC-C "All Other Systems" Usage Prebid Approval Asking Form (md) | 0 | 12/21/21 |
Reference: Risk Category for Explosive Facilities at LANL (pdf) | - | 7/22/21 |
III, Nuclear SSCs Blueprint and Analysis Requirements | ten | 07/19/21 |
Reference: Hilti KB-TZ and KB-TZ2 Anchor Supply/Option Guidance (TA-55 only) | 08/09/21 | |
4, Geotechnical Investigations | half-dozen | 03/27/xv |
Affiliate References | ||
Requirements ID Log (xls) (e.g., 5-0XXX; LANL only) | ||
NOTE: Building PC true cat historical data is in ARCHIBUS. Access with cryptocard; select Infinite Inventory & Performance, then LANL Special Reports, and then Ascertain Seismic Information (newer RC or NDC/LS information may also be there). The contacts for updates are Kenny Feller and Scott RichardsonEquipment/Component PC and RC/NDC information is in CMMS (use IE). |
Top of page
ESM (Chapter 6 - Mechanical)
POC: Michael Ladach, ES-EPD, 667-6229 Alternate POC: Todd Smith, ES-EPD, 665-3152 Suggestions (LANL Merely; utilize IE)
Section/Title | Rev. | Date |
---|---|---|
D10-30GEN, General Mechanical Requirements (READ Commencement) VAR-10053, Exception to Equipment Housekeeping Pad Requirement | 5 | 09/29/14 |
D10+E10, Equipment | 4 | 09/29/fourteen |
D20, Plumbing/Piping/Vessels | 6 | 02/26/15 |
D30, HVAC, Heating, Cooling, HVAC Distribution and TAB VAR-10298, ASME AG-one and DOE-HDBK-1169 Applicability to Not-Credited Ventilation Systems | 5 | 09/29/14 |
Chapter References | ||
UMC and UPC (read but) from IAPMO website (LANL can use IHS) |
Top of page
ESM (Chapter seven - Electric)
POC: Eric Stromberg, ES-EPD, 665-6070 Alternate POC: Michael Richardson, ES-EPD, 667-0599 Suggestions (LANL Simply; apply IE)
Department/Title | Rev. | Engagement |
---|---|---|
D5000, Full general Electric Requirements (READ Starting time) | 8 | 07/24/19 |
D5010, Electrical Service & Distribution Reference: Transformer Pattern Guidance, R0 9/14/21 | v | 02/eleven/19 |
D5020, Lighting & Co-operative Circuit Wiring VAR-2014-046, Non-Powered Exit Signs VAR-10183, Allowance for multi-wire co-operative circuits VAR-10139, Dedicated Equipment-grounding Conductors and Raceways (affects D5020) | 5 | xi/08/11 |
D5030, Communications (Superseded past Ch.19-D60) | ||
D5090, Other Electrical Systems | 5 | 12/nineteen/xiii |
G4010, Site Electrical Distribution | 4 | 01/15/19 |
G4020, Site Lighting | 3 | 05/12/10 |
G4030, Site Communication (Superseded by Ch.nineteen-G50) | ||
G4090, Other Site Electrical Utilities | 2 | ten/27/06 |
Chapter References | ||
Electrical Inspection Plan Guidance | 0 | 02/25/twenty |
Tiptop of page
ESM (Chapter 8 - Instrumentation & Controls)
POC:Allen Hayward, ES-EPD, 606-0840 Alternate POC:TBD Suggestions (LANL ONLY; utilise IE)
Section/Title | Rev. | Date |
---|---|---|
Department D3060.90- Instrumentation & Command (READ FIRST) | iv | 09/29/xiv |
Attachment A: Instrumented Systems used in Safe Pregnant & Hazardous Processes Blueprint Guidance | two | 09/29/14 |
Zipper B: Fail Safe Blueprint of Procedure Control Loops Guidance | 2 | 09/29/xiv |
Zipper C: I&C Design Review Guidance | 2 | 09/29/14 |
Zipper D: Installation & Calibration of Instruments Guidance | ii | 09/29/fourteen |
Attachment E: Alarm Direction Guidance | 2 | 09/29/14 |
Zipper F: Instrument Loop Diagrams Guidance | ii | 09/29/14 |
Zipper G: Control Logic Diagrams Guidance | 2 | 09/29/14 |
Attachment H: Console and Wiring Diagram Guidance | 2 | 09/29/14 |
Attachment I: PFD and P&ID Diagram Requirements | ane | 09/29/xiv |
Peak of page
ESM (Chapter ix - Security)
POC: Jeff Mccale, SEC-PSS, 667-9764 Alternate POC: Deborah Miller, SEC-PSS, 606-2067 Suggestions (LANL Just; use IE)
Section/Title | Rev. | Date |
---|---|---|
Facility Protection and Security [email for access] | 4 | 01/08/18 |
VAR-10381, Vault Door and X-ray Automobile Purchase Approvals |
Top of page
ESM (Affiliate 10 - Hazardous Procedure)
POC:Devin Grayness, ES-55, 667-3584 Alternate POC: Tobin Oruch, ES-Fe, 665-8475 Suggestions (LANL But; employ IE)
Section/Title | Rev. | Date |
---|---|---|
F1030.threescore, Chancy Process | 2 | 09/29/14 |
Attachment A: Hazardous Gas Design | 2 | 09/29/14 |
Top of folio
ESM (Chapter 11 - Radiation Protection)
POC: Keith Luna, RP-PROG, 667-1142 Alternating POC: Jordan Douglas, RP-PROG, 665-2445 Suggestions (LANL Merely; use IE)
Department/Title | Rev. | Engagement |
---|---|---|
F1030.50, Radiation Protection | ii | 01/08/18 |
Attachment A: Radiation Protection Design Considerations & Features (Guidance) VAR-10347 - Radiological Engineering science Design/Blueprint Support | 2 | 01/08/eighteen |
Acme of page
ESM (Affiliate 12 - Nuclear)
POC: Tobin Oruch, ES-Iron, 665-8475 Alternate POC: TBD Suggestions (LANL Merely; apply IE)
Section/Championship | Rev. | Engagement |
---|---|---|
F1030.70, Nuclear | 3 | 09/29/14 |
Top of folio
ESM (Chapter 13 - Welding, Joining & NDE)
POC: David Bingham, ES-EPD, 664-0416 Alternate POC: Richard Bingham, PF-TDI, 667-7077 Suggestions (LANL ONLY; employ IE)
Section/Championship | Quick Links | |
---|---|---|
Table of Contents | - 1-99, Glossary | |
-Exemptions | ||
Volume 1 - Full general Welding Standards (GWS) | -Filler Textile Locations/Issuers | |
Volume two - Welding Fabrication Procedures (WFP) | -Filler Metal Documents | |
Book three - Welding Procedure Specifications (WPS) | -Inspectors | |
Volume 4 - Welding Technique Sheets (WTS) | -LANL WPS Index | |
Volume 5 - Procedure Qualification Records (PQR) | -Warehouse Stocked Filler Fabric | |
Volume six - Welding Inspection & Full general NDE | -Welding Checklist | |
-Welder Qualification Database |
Tiptop of page
ESM (Chapter 14 - Sustainable Design)
POC: Tobin Oruch, ES-Iron, 665-8475 Alternate POC: Michael Ladach, ES-EPD, 667-6229 Suggestions (LANL Simply; use IE)
Section/Title | Rev. | Engagement |
---|---|---|
Sustainable Design of Facilities | x | 07/31/2019 |
Attachment i- Environmentally Preferable Products for Design Agency Created Specifications | 02/03/2022 | |
Chapter References: | ||
Chapter 14 References |
Height of page
ESM (Chapter xv - Commissioning)
POC: Cindy Dilworth, CM-STUPCOMM, 665-6304 Alternating POC: Charles Richardson, CM-STUPCOMM; 667-3374 Suggestions (LANL Just; use IE)
Section/Title | Rev. | Date |
---|---|---|
Commissioning | one | 03/22/19 |
Attachment A: Commissioning Process Catamenia Chart | 1 | 03/22/nineteen |
Affiliate References: | ||
DOE G 413.three-23, Nuclear Facilities Commissioning [directives.doe.gov] |
Top of page
ESM (Affiliate 16 - IBC Program)
POC: Tobin Oruch, ES-Iron, 665-8475 Alternating POC: Scott Richardson, ES-EPD, 606-0596 Suggestions (LANL Just; use IE)
Section/Title | Rev. | Date |
---|---|---|
IBC-GEN - IBC General Requirements (READ Kickoff) | 11 | 11/29/18 |
Att. A: LANL Edifice Code (LBC) | 12 | 02/05/21 |
Att. B: LANL Existing Building/System Code (LEBC) | nine | 03/24/21 |
Class 1: Preliminary Project Determinations (Instructions) | 5 | 02/17/21 |
Course 2: HazMat Decision | 1 | 05/22/14 |
Form 3: Registered Design Professional in Responsible Charge Designation (Sample) | 1 | 09/24/xiii |
Form 4: LBO Observe of Violation | 0 | 09/24/13 |
Form five: Building/System Final Inspection Checklist and Certificate of Occupancy | 8 | 03/30/15 |
Reference: Fire Alarm Work Alteration Levels (ES-Practise-Memo-22-003) Reference: Certificate of Occupancy Checklist Template (12-vii-2020) | - - | |
IBC-IP - IBC Inspection Process VAR-10168, ESM Chapter 16-IBC Program Inspection Scope | 9 | ten/06/16 |
Attachment A: Special Inspection and Testing Summary (Sample) | i | 09/24/thirteen |
Attachment B: Statement of Special Inspections | 14 | 05/eighteen/21 |
Zipper C: Nonconformance Study Instance | i | 09/24/13 |
Attachment D: IBC Inspection Daily Report (Sample) Reference: WI-400-282-FM01: IBC/Owner's Inspection Written report | ane | 09/24/13 |
Zipper E: IBC Inspection Concluding Written report (Sample) Reference: WI-400-282-FM02, Final Report of Special Inspections by LANL | 2 | 09/24/13 |
Attachment F: Job Task Listing for Inspectors (Guidance) | 1 | 09/24/13 |
Attachment G: Structural Ascertainment Class (Sample) | 3 | 03/27/15 |
Attachment H: Subcontractor's Argument of Responsibility | ii | 03/27/xv |
Zipper I: Exam and Inspection Program Template | 0 | 09/24/13 |
Reference: Fire Protection Div of Responsibilities for Construction Inspection | 4 | 09/30/20 |
Reference: Electrical Inspection Plan Guidance | 0 | 02/25/xx |
Reference: Independence Requirements for Tertiary Party Inspection Agencies (LANL merely) NEW Dec 2021 | - | |
IBC-TIA - IBC Test and Inspection Bureau Approval Process | 3 | 09/xv/09 |
Zipper A: IAS Special Inspection and Testing Bureau Approval Information | 1 | 07/21/08 |
Attachment B: Inspector Qualification Guidelines | 5 | 10/10/12 |
IBC-FAB - Offsite Structural Fabricator Approval Procedure | 6 | 06/20/xi |
Attachment A: Offsite Structural Fabricator Application for LBO Blessing | 1 | 07/21/08 |
Attachment B: Offsite Structural Fabricator Certificate of Compliance | 0 | 07/21/08 |
Chapter References: | ||
Listing of LBO-Approved IBC Testing, NDE, and Inspection Agencies; Fabricators; and Products | 07/28/21 | |
Arrangement Chart | xi/09/21 | |
IBC or IEBC Review Subject Matter Adept Listing (LANL only) | ||
NEW!! IBC Permitting Process (LANL only) | 04/fifteen/15 | |
LBO Permit Database (LANL WIN account required, enter password if prompted) NEW! | ||
IBC-2015: Equally of i/27/2021, Third Printing is latest. PDF users, download from IHS. Older hardcopy users, Errata are here (from ICC errata site here). | ||
IEBC-2015: Equally of 1/27/2021, Fifth Press is latest. PDF users, download from IHS. Older hardcopy users, Errata are here (from ICC errata site here). | ||
Historical UBC 1927-1964 and 1967-1994; Contact POC for 1997 UBC and IBC 2000 onward | ||
Free I-code views (search IBC, IEBC, IFC, IECC, etc.; LANL can use IHS) | ||
ARMAG robust structure summary of LANL requirements and guidance (LANL only, xls), R0, 10/iv/2021 |
Top of page
ESM (Affiliate 17 - Pressure Safety)
POC: Ari Ben Swartz, ES-EPD, 606-2279 Alternate POC: Tobin Oruch, ES-Fe, 665-8475 Suggestions (LANL Only; utilize IE)
Section/Championship | Rev. | Engagement |
---|---|---|
GEN - GENERAL Requirements (READ FIRST) | 0.1 | 12/16/21 |
Attachment GEN-1, Definitions and Acronyms | 1 | 03/15/16 |
VAR-10281-R3, Certification of Force per unit area Systems (see ADMIN-1 below) | ||
Zipper GEN-2, Exclusions from Program | 0.ane | 08/21/17 |
Zipper GEN-3, OSHA Requirements for Force per unit area Systems | 0 | 09/17/xiv |
ASME - New ASME System Requirements | 1 | 12/eleven/18 |
Zipper ASME-1, Code and Regulation Awarding | 0 | 09/17/xiv |
Attachment ASME-2, National Board Inspection code NB-23 | 0 | 11/09/xviii |
Attachment ASME-3, Category M Fluids | 0 | 09/17/14 |
Attachment ASME-4, Acceptable Items for Code Construction | 0 | 09/17/14 |
Zipper ASME-4-i, Designer-Canonical Alternative Hose Restraints | 0 | 09/17/fourteen |
Attachment ASME-4-2, Swagelok Flex Hoses | 0 | 09/17/xiv |
Attachment ASME-five, B&PVC Awarding | 0 | 11/09/eighteen |
Unlisted Components Approval Process and Forms | ||
NASME - New Non-ASME Organisation Requirements | 0 | 09/17/14 |
NASME-one, B31.3 Equivalent Safety Evaluations: | ||
NASME-1-A, Category D Non-Metallic Requirements for Piping Not Associated with Pressure Vessel, Boilers, or Air Receivers | 1 | 06/xxx/xv |
NASME-one-B, Category Normal Not-Metallic Requirements for Piping Not Associated with Pressure Vessel, Boilers, or Air Receivers | 1 | 06/30/15 |
NASME-1-C, Normal Fluid Service Requirements for Metallic Piping Not Associated with Pressure Vessel, Boilers, or Air Receivers | 2 | 08/24/15 |
NASME-i-D, Category D Requirements for Metallic Pipe not Associated with Pressure Vessel, Boilers, or Air Receivers | 2 | 11/09/18 |
NASME-ii, B31.ix Equivalent Condom Evaluation | 0 | 03/03/16 |
Reference: When listed components cannot be used, reputable manufacturers equally discussed in NASME-i-a, b, etc. (xls) (LANL only) | 02/07/2022 | |
EXIST - Legacy System Requirements | 2 | 05/25/17 |
VAR-10163, In Process Examination of Tie-in to Existing Contaminated Pipage | ||
VAR-10198, In-process Test of Tie-in to Existing Contaminated Wet Vac Pipe | ||
Exist-i, Gamble-Based Technology Evaluation of Existing (Legacy, etc.) Pressure Systems | 0 | 09/17/14 |
EXIST-1a, Qualitative Hazard for Inert Gas Cylinders Existing Systems Only | 0 | 09/17/14 |
EXIST-1b, Qualitative Risk for Low Force per unit area Steam and Steam Condensate | 0 | 09/17/14 |
Exist-1c, Qualitative Chance Evaluation for Compressed Air Systems Existing Systems Only | 0 | 09/17/14 |
ADMIN- Administrative Requirements | 0 | 09/17/14 |
ADMIN-1 , LANL Review Processes | 1 | 03/xv/16 |
VAR-10281-R3, Certification of Pressure Systems Att A: R&D Force per unit area System Certification Process (with forms FM-R&D-REVIEW and FM-R&D-DOCS) Att B: Facility and Non-R&D Pressure Arrangement Certification Process (with required documentation by ASME B31 codes) (B31.ane), (B31.3), (B31.5), (B31.viii), (B31.9) | ||
Reference: PSIP/Pressure Safety Implementation Plan - TLW Example (LANL only/by request) | ||
ADMIN-1-1, Pressure Rubber Forms FM01-FM10 (pdf) | 2 | 03/fifteen/16 |
Reference: PSCS database xls-like templates for documentation vice Word forms | ||
ADMIN-ane-2, Course Directions (FM01-FM10) | 0 | 09/17/fourteen |
ADMIN-ane-3, Existing (including Legacy) System Documentation Requirements VAR-10317, Certification of Legacy Pressure Prophylactic Systems VAR-Attachment: Modified Zipper ADMIN-1-three (Tables 1-three-N through U) | 0.i | 05/04/sixteen |
ADMIN-i-four, New Organisation Document Requirements | 0 | 09/17/14 |
Reference: Pressure Exam Data Sail Example (WI-400-260-FM04, R4) | ||
ADMIN-1-five, Pressure level System Owner Checklist for New or Modified Systems (Guidance) | 0 | 09/17/14 |
ADMIN-1-6, Risk-Based Certification Processing and Maintenance (Guidance) | 0 | 09/17/14 |
ADMIN-ii , Design, Documentation, and Records Note: The variances listed below use to ADMIN-ii, 1.0 Design and Documentation, Subsection N. Material Compatibility (pg. 12) VAR-2016-006, ASME B31.3-2014 as the lawmaking of record for hydrogen, deuterium, or tritium services Subsection R. Piping Flanged Joint Connection Assembly (pg.eighteen) VAR-10119 Rev. 1, Possessor Acceptance of ASME B16.5 Flange Design (e.g., Commodities Stress) Subsection S. Piping Supports and Flexibility Analysis (pg.18) VAR-10128, Acceptance of Engineered Piping Supports Subsection T. Force per unit area Relief Requirements (pg.19) VAR-2015-045, Alternate Method for Relief Devices ESM-CIR-2015-005, ASME Code Stamped Subsection X. Vacuum and Externally Pressurized Components and Pipe (pg.25) VAR-2015-032, Conflat Flanged Fittings (attachments take been removed from this file) | 0 | 09/17/fourteen |
Unlisted Components Approving Procedure and Forms | ||
ADMIN-ii-1, Relief Device Selection Process for Gas Bottle Systems (Guidance) | 0 | 09/17/14 |
ADMIN-three , Procurement, Fabrication, and Assembly NOTE: The variances listed beneath employ to ADMIN-3, Procurement, Fabrication, and Assembly Subsection O. Flanged Joint Assemblies (pg.7) VAR-10119 Rev. 1, Owner Credence of ASME B16.5 Flange Pattern (due east.grand., Bolt Stress) | 0 | 09/17/14 |
ADMIN-three-FM01, Regulator and Relief Device Procurement Pre-approval | 3 | 03/31/21 |
ADMIN-3-FM02, ASME Vessel Pre-approval | ane | 03/31/21 |
ADMIN-3-FM03, Steam and Banality Regulator and Relief Device Procurement Pre-blessing | 2 | 03/31/21 |
Reference: Approver Listing for Pressure level System Component Buy | ||
ADMIN-four , Inspection and Testing | 1 | 11/18/15 |
VAR-10429, Relief Device Settings for Pneumatic Testing | 0 | 02/11/21 |
VAR-10478, Mitsubishi City Multi VRF PURY-P TLMU-A and YLMU-A R410A Force per unit area Testing | 0 | 08/03/21 |
Reference: Pressure Test Data Sheet Example (WI-400-260-FM04, R4) | ||
Reference: ASME-B31.5 Refrigeration Pipe Test Plan Template | ||
Reference: ASME-B31.5 Specific Leak Testing Information Sheet | ||
ADMIN-iv-1, Pressure level Vessel Inspection and Test Procedure | 0.i | 02/29/16 |
ADMIN-4-2, Hose Assembly Inspection (Guidance) | 0 | 09/17/xiv |
ADMIN-4-iii, Pressure Regulator Maintenance (Guidance) | 0 | 09/17/14 |
REF - Reference | ||
REF-i, 10CFR851 on Pressure Safe (See 10CFR851 link under Chapter References below) | 0 | 09/17/14 |
REF-2, ASME Codes; Standards; Regulations; and other References [list and links only] | 0 | 09/17/fourteen |
REF-3, ASME B31.3 Process Pipe Guide - [temporarily withdrawn] VAR-2015-011, Copper Tubing Alternative | ||
Quality Control Systems Manual (R-Stamp Programme, LANL simply) VAR-10170, Continued Operation of NBIC Owner User Inspection Program | 0 | 9/7/xvi |
QCSM-ISQP-Inspector and Supervisor Quality Programme (LANL only) | 0 | 12/11/18 |
Chapter References: | ||
Pressure Protection webpage (CAP, PS Committee, etc.) (LANL only) | ||
Pressure Arrangement Certification System | ||
10CFR851 Worker Safety and Health Programme with Technical Amendment, key info in Subpart C and App A | 12/18/17 | |
DOE Worker Safe and Health Policy Clarification Portal (PC Portal) | ||
Affiliate 17, Boosted Pressure Rubber Reference Data including Swagelok assembly (LANL merely-click for alive links) | ||
Chapter 17, Pressure Safety entire affiliate (mostly including attachments and amendments [labwide variances and clarifications every bit attachments]). Meant to assistance browsing or searching for topics, only not performing work by it. | last updated 1/09/twenty |
Pinnacle of page
ESM (Chapter xviii - Secure Communications)
POC: Adrian Trujillo, NIE-ESS, 667-2581 Alternating POC: Sean Beggio, NIE-TS, 665-8191 Suggestions (LANL Simply; use IE)
Section/Title | Rev. | Date |
---|---|---|
Secure Communications | 1 | 02/12/fifteen |
Top of page
ESM (Chapter 19 - Communications)
POC: Pete Lowe, NIE-TS, 665-9147 Alternate POC: TBD Suggestions (LANL Only; use IE)
Section/Title | Rev. | Date |
---|---|---|
D60, Communications | one | 09/01/20 |
G50, Site Communications VAR-2016-024, Length of pathway | 0 | 02/23/fifteen |
Pinnacle of page
ESM (Affiliate 20 - Systems Engineering)
POC: Tobin Oruch, ES-Atomic number 26, 665-8475 Alternating POC: TBD Suggestions (LANL ONLY; employ IE)
Department/Championship | Rev. | Appointment |
---|---|---|
SE Requirements | 0 | 09/20/17 |
SE Guide | 0 | 09/20/17 |
References: | ||
SE SEP Estimate Example (xls) | ||
Blueprint Verification Matrix Template Sample |
ESM (Chapter 21 - Software)
POC: Tobin Oruch, ES-Fe, 665-8475 Alt POC: Allen Hayward, ES-EPD, 606-0840 Suggestions (LANL Only; use IE)
ES-Div Software Coordinator: Carrie Atencio, ES-Practice, 665-7455
Section/Title | Rev. | Date |
---|---|---|
SOFT-GEN: General Software Requirements (READ First) (file also includes appendices) | 1 | 05/25/17 |
Appendix A: Chapter 21 Definitions, Responsibilities, and Acronyms | 1 | 05/25/17 |
Appendix B: Chapter 21 SO and SRLM Decision Diagram (Guidance) | i | 05/25/17 |
Appendix C: Chapter 21 Reference List | 1 | 05/25/17 |
Attachment 1: Chapter 21 Summary Table | i | 05/25/17 |
SOFT-GEN-FM01: Software Datasheet Form (SWDS) SOFT-GEN-FM01(I): Instructions with Example | 1 one.1 | 05/25/17 09/01/17 |
SOFT-GEN-FM02: Software Baseline Grade (SWBL) SOFT-GEN-FM02(I): Instructions with Case | 1 | 05/25/17 |
SOFT-GEN-FM03: Non-SSC Software Change Bundle Class (SWNCP) SOFT-GEN-FM03(I): SWNCP Instructions with Case | one i.1 | 05/25/17 03/27/18 |
SOFT-GEN-FM04: SSC Software Change Package Course (SWCP) SOFT-GEN-FM04(I): SWCP Course Instructions VAR-10365-R1, Ch 21 SSC Software Alter Packet Form superseding AP-341-507 | i | 09/28/20 |
References: | ||
GEN Subsection two.0 Example Software Summary | ||
Form 2033, Safe/Non-Safety Software Decision, Categorization, and Software Risk Level (SRL) VAR-10326-R1, Chapter 21 (Software) activity and form approvals for Safety Footing and Nuclear Criticality Safety Divisions Template 3046, Software Risk Register (contact POC for examples)(.dotx) | ||
SOFT-Larn: Acquisition | one | 05/25/17 |
Reference: ANSYS Fluent CGD/5&V Package Instance (request from Chapter POC) | ||
SOFT-Design: Design | i | 05/25/17 |
References: | ||
Software Requirements Specification (SWRS) Example (Source Tracker) | ||
Blueprint Document (SWDD) Example Template | ||
Pattern Certificate Case for Designed Software (Source Tracker) | ||
User Manual (O&M instructions) for Designed Software (Source Tracker) | ||
SOFT-V&V: Verification & Validation | one | 05/25/17 |
Appendix A: Software Test Program Requirements Table | ||
SOFT-Five&V-FM01: Software Approval for Use Grade (SWAU) SOFT-V&V-FM01(I): Instructions With Example | i | 05/25/17 |
References: 5&V Templates and Examples | ||
Form 3056 - Software Requirements Traceability Matrix (SWTM) (.dotx) Helps implement SW requirements ID and traceability requirements | ||
Example Requirements Traceability Matrix (Source Tracker) | ||
Software Test Plan (SWTP) Template | ||
Software Exam Instance (SWTC) Template | ||
Case No. 1 Test Plan (Source Tracker) | ||
Example No. 1 Test Program/Report (Source Tracker) | ||
Instance No. 2 Test Study | ||
Example No. 3 Exam Study | ||
Instance SWAU Request Package Checklist (MACCS2) | ||
SOFT-INV: Inventory | i | 05/25/17 |
SOFT-MAINT: Apply, Maintain & Retire | 1 | 05/25/17 |
Chapter References: | ||
Document Numbering SharePoint (LANL only) | ||
ES Division Not-SSC Software Inventory (LANL simply) ESDO-AP-002, Engineering Services (ES) Software Inventory Instructions (LANL only) Rev. 0, 06/05/17 | ||
Safety Software Inventory (LANL simply) | ||
Chapter 21, Software unabridged affiliate (generally including attachments and amendments [does not include labwide variances and clarifications]). Meant to help browsing or searching for topics, but not performing piece of work past it. | last updated 01/09/20 |
Height of page
Source: http://engstandards.lanl.gov/ESM_Chapters.shtml
0 Response to "Chapter 17 a+ Guide to It Technical Support Reviewing the Basics"
Post a Comment